Problem: Lab Fixture Audit Stalls Without Dim Reports — What to Select
Problem: instrument / lab fixtures arrive on time, but IQ/OQ or supplier audit stalls because dimensional reports, material CoC, or NDA wording were never scoped.
Boundary: we machine non-implant housings and lab structures — not implants / ITAR by default. Factory visits can be booked via contact.
Fix: at quote select Dimensional report / CMM / FAI / CoC as needed; send NDA early; call out passivation or anodize + cleaning notes on the drawing.
Lead sketch: Standard ≈ 10 days reference (production + air). Extra inspection adds calendar days — shown separately from courier days.
Upload CAD on the quote page with the QA checkboxes you need, then book a visit if your QA team must see QC in Dongguan.