Typical Standard ~10 days (prod + air sketch) · Express ~6 days · down to 0.001 mm

Get AI Instant Quote

Zoryra Precision

Robotics & Automation CNC in Dongguan

Typical parts + fit-critical tolerances + DFM notes for automation cells — not just an industry tag.

  • Datum clarity
  • Thread inserts
  • Anodize masking
  • FAI on request

Automation buyers care about repeatable datums and insert stacks. We quote aluminum / stainless fixtures first, then confirm tight interfaces in DFM.

Lead-time tiers (Economy / Standard / Express) keep pilot cells on a calendar — Standard ≈ 10 days reference including shipping sketch.

Why choose Zoryra Precision for Robotics & automation

Clear typical parts

EOAT / flange plates · Cable & sensor brackets · Camera / vision mounts

Tolerance & DFM first

Fit faces often ±0.02–0.05 mm; fine datums down to ±0.002 mm / 0.001 mm capability when called out — drawing governs. Optional CMM / FAI in quote.

Optional inspection docs

Datum clarity · Thread inserts · Anodize masking · FAI on request

Typical parts

  • EOAT / flange plates
  • Cable & sensor brackets
  • Camera / vision mounts
  • Fixture plates & light frames

Tolerance guidance

Fit faces often ±0.02–0.05 mm; fine datums down to ±0.002 mm / 0.001 mm capability when called out — drawing governs. Optional CMM / FAI in quote.

Watch-outs

  • Mark Helicoil / insert type and critical faces
  • Anodize masking on mating threads
  • Share datum scheme early for multi-part stacks

Common processes

FAQ

Can you machine EOAT plates with inserts?

Yes — mark insert type and critical faces; inserts quoted as a feature tier.

Typical lead time for automation fixtures?

Standard tier ≈ 10 days reference (production + shipping sketch); Express ≈ 6 days when material/finish allow.

Upload CAD for this industry

Itemized reference + lead tiers + optional inspection. Escalate complex jobs.

Other industries

AIQuoteEmail