
Inspection agreed at quote
Outgoing check, dims report, material cert, FAI, and CMM are selectable on the quote — cost and lead impact visible before PO.
Zoryra Precision
Inspection tier is selected at quote time so critical tolerances are agreed before production — not after arrival.
Quality control
Pick inspection tiers at quote time so critical dims are agreed first. Dongguan production with optional dims / FAI / CMM / material certs — factory visits on request.


Outgoing check, dims report, material cert, FAI, and CMM are selectable on the quote — cost and lead impact visible before PO.

Critical dims, cosmetics, and keep-outs go on the job card. Complex / 5-axis / high-inspection jobs can escalate to engineers before release.

Dimensional / CMM checks per order, with agreed reports. Formal system certificates only when verified copies exist for qualified buyers.
Caliper / micrometer checks on critical dims with recorded results — fewer surprises after delivery.
First-piece review against design, critical dims, and cosmetic rules — best before volume release.
Coordinate measuring for geometry, form/position, and tighter feature location — report on request.
Unless noted, CNC / sheet metal often use ISO 2768 medium as a talking baseline. Tighter fits, GD&T, and mating faces should be called out on the drawing and confirmed at quote.
Common general-tolerance baseline — your drawing always wins.
Fits, datums, sealing faces — mark on 2D; we can mirror them on the job card + inspection tier.
Anodize / blast / passivate / powder matched to material; photo or sample references welcome.
Upload CAD and select dims / FAI / CMM / material cert. For visits or supplier questionnaires, use Contact.
Only capability claims we can stand behind. Floor area, machine counts, and ISO certificate numbers appear only when verified.
Standard outgoing check; dimensional / CMM reports; material certificates (CoC); first-article inspection (FAI). Critical dimensions are agreed at quote time.
1) Select inspection in quote → 2) Confirm critical dims with engineering if needed → 3) Produce with job-card notes → 4) Inspect & ship with agreed documents.
Material certificates, dimensional / CMM reports, and FAI available by order selection. Formal ISO certificate numbers are shared only when verified copies are available to qualified buyers — we do not invent cert claims on the website.
CAD uploaded for quote preview stays in your browser session until you save a quote or place an order. Mutual NDA available before sensitive transfers. Chat is for questions — large STEP/STL files use Upload for quote.
| Item | Spec |
|---|---|
| Outgoing check | Included by default |
| Dimensional report | Optional — select in quote |
| Material cert (CoC) | Optional — per order agreement |
| FAI | Optional first-article package |
| CMM | Optional CMM report |
| NDA | Available before sensitive file transfer |


Yes — request via contact or engineer chat before sharing sensitive files.
No — CMM / FAI / material certs are optional tiers selected on the quote to keep cost transparent.
Only when verified copies exist for qualified buyers. We do not invent certification marketing.
AI Instant Reference Quote + engineering review within 12 business hours.